TBS Amwell supplied high-quality a commercial washroom solution for Cadillac’s new Formula 1 racing team, delivered as part of an internal fit-out of a warehouse unit for the team and their corresponding engineering departments. Working in collaboration with washroom installer and contractor AT Commercial Interiors, the project required durable, design-led washroom systems capable of supporting a high-performance technical environment.
Contractor
AT Commercial Interiors
Cadillac F1 Team Headquarters Washroom
The client required modern washroom facilities for male and unisex areas that aligned with the clean, modern aesthetic of the wider building. Key priorities included durability, ease of maintenance, and a streamlined finish, alongside efficient use of space. As a manufacturer and supplier of tailored commercial washroom systems, TBS Amwell was specified to deliver a solution that met both functional and visual requirements.
TBS Amwell provided a fully coordinated washroom solution designed to support the client’s brief. By combining robust materials with intelligent design features such as concealed services and accessible maintenance points, the solution ensured long-term performance while maintaining a sleek, minimalist appearance. The result was a practical, yet refined washroom environment suited to a high-specification engineering facility.
The PDQ Panel & Frame IPS system provided a fast-to-install, precision-engineered solution for concealing washroom services. Supplied with panels pre-assembled to a galvanised steel frame, the system is up to 50% quicker to install than traditional timber-framed IPS solutions, significantly reducing on-site labour time for contractors. Plus, the prefabricated components ensure accurate alignment and a consistent, high-quality finish.
Hinged and lockable access panels allow for simple, secure maintenance access, supporting long-term usability. Manufactured from 13mm Solid Grade Laminate, the IPS wall panels offer excellent resistance to moisture and impact, making them ideal for high-traffic commercial washrooms, and completed in our modern Stone and Fog laminate finish.
The Lago Slim solid surface washtrough delivers a sleek, space-efficient handwashing solution with strong hygiene benefits, making it ideal for high-traffic commercial washrooms. It’s thermoformed solid surface construction creates a smooth, non-porous finish that minimise dirt traps and allows for easy cleaning and maintenance, supporting long-term performance in busy environments.
The washtrough was installed onto our Solid Grade Laminate PDQ Vanity & Frame system, complete with our Stone and Fog laminate finish. Hinged and lockable access panels provide secure and convenient access to services for facility managers. Supplied as a pre-assembled commercial vanity unit, the system arrives on-site ready to install and is up to 90% faster to fit than traditional washroom vanity systems.
Delivered in two complete units comprising of a galvanised metal frame, back panel, underpanel and washtrough, the solution enabled a simple and efficient installation while ensuring a clean, consistent, and durable finish across the washroom environment.
The completed washrooms at the Cadillac F1 Team building delivered a clean, modern and highly functional environment that reflects the precision of the wider facility. TBS Amwell’s commercial washroom solutions provided a balance of durability, aesthetics, and ease of maintenance, supporting both the contractor’s installation requirements and the client’s long-term operational needs. This project highlights the value of specifying high-performance IPS panel systems and solid surface washtroughs for commercial washroom fit-outs.
Nursery & Primary School Washrooms